Published in

Taylor & Francis (Routledge), Construction Management and Economics, 2(37), p. 72-88, 2019

DOI: 10.1080/01446193.2018.1506139

Links

Tools

Export citation

Search in Google Scholar

A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia

Journal article published in 2019 by Mohd Azrai Azman, Carol K. H. Hon, Martin Skitmore, Boon Liat Lee, Bo Xia ORCID
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO