Published in

Fusion Technology, 2P2(39), p. 359-366, 2001

DOI: 10.13182/fst01-a11963260

Links

Tools

Export citation

Search in Google Scholar

First Test Results on ITER CS Model Coil and CS Insert

This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Orange circle
Postprint: archiving restricted
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

The Inner and Outer modules of the Central Solenoid Model Coil (CSMC) were built by US and Japanese home teams in collaboration with European and Russian teams to demonstrate the feasibility of a superconducting Central Solenoid for ITER and other large tokamak reactors. The CSMC mass is about 120 t, OD is about 3.6 m and the stored energy is 640 MJ at 46 kA and peak field of 13 T. Testing of the CSMC and the CS Insert took place at the Japan Atomic Energy Research Institute (JAERI) from mid March until mid August 2000. This paper presents the main results of the tests performed.