Published in

Taylor and Francis Group, Chemical Engineering Communications, 8(192), p. 1067-1084

DOI: 10.1080/009864490522605

Links

Tools

Export citation

Search in Google Scholar

An MILP model for optimal scheduling of the lubricant production plant

Journal article published in 2005 by Philip Doganis ORCID, Haralambos Sarimveis, George Bafas, Dimitrios Koufos
Distributing this paper is prohibited by the publisher
Distributing this paper is prohibited by the publisher

Full text: Unavailable

Red circle
Preprint: archiving forbidden
Orange circle
Postprint: archiving restricted
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO