New Approach to Treat Broken Pile in Cast-In Site Bored Pile

Journal article published in 2013 by Guang Hui Wang, Cheng Long Wei
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Red circle
Preprint: archiving forbidden
Red circle
Postprint: archiving forbidden
Green circle
Published version: archiving allowed
Data provided by SHERPA/RoMEO

Abstract

Many cast-in-site bore pile have broken pile because of collapsing in wall of holl. Based on the principle of mechanics, a new combination approach was proposed for dealing with the broken pile. The approach is displacing the soil in the pile by cement paste and increasing the height and the steal ratio of the top beam which is on the defect pile. Using the finite element software, we have set up the analysis model of the approach, which helps to demonstrate the rationality of this method. This method can be referenced by the reinforcement and maintenance of the bridges.