Manufacturing Scheduling for Energy Cost Reduction in a Smart Grid Scenario

Proceedings article published in 2014 by Hao Zhang, Fu Zhao ORCID, John W. Sutherland
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

The purpose of this paper is to demonstrate the feasibility of reducing electricity cost for a manufacturing factory through scheduling in a smart grid scenario while maintaining production throughput. Different from traditional rate structure, electricity price of smart grid is time varying and dependent on the total demand. The most common strategy for a factory to reduce electricity cost is to shift electricity usage from on-peak hours to off-peak hours. However, changes in manufacturing schedules affect power demand and electricity price. Moreover, a manufacturing process cannot be interrupted after being started. This dynamic coupling brings additional challenges to scheduling problem that is already NP-hard. In this paper, a time-indexed integer programming scheme is developed and implemented in General Algebraic Modeling System to solve the scheduling problem. To demonstrate the approach, a hypothetical region including power distribution/transmission system, residential/commercial buildings and a flow shop operating 8/16 working hours/day is considered. The operation of residential/commercial buildings is subject to time-of-use tariff and described in GridLAB-D. Simulation results show that the factory electricity cost is reduced by 2%–4% without any production loss. The results also suggest that in addition to residential/commercial buildings, it is possible to involve manufacturing facilities in demand-side management.