Dissemin is shutting down on January 1st, 2025

Published in

SAGE Publications, Tumori Journal, 4(98), p. 441-444, 2012

DOI: 10.1177/030089161209800407

Tumori, 2012July-August, 2012

DOI: 10.1700/1146.12637

Links

Tools

Export citation

Search in Google Scholar

Daily on-line set-up correction in 3D-conformal radiotherapy: Is it feasible?

This paper is made freely available by the publisher.
This paper is made freely available by the publisher.

Full text: Download

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

Aims and background The aim of this report was to investigate the feasibility in terms of treatment time prolongation of an on-line no-action level correction protocol, based on daily electronic portal image verification. Methods and study design The occupation of a linear accelerator (LINAC) delivering 3-D conformal treatments was monitored for two weeks (from Monday to Friday, 10 working days). An electronic portal image device I-View (Elekta, UK) was used for setup verification. Single-exposure portal images were acquired daily using the initial 8 monitor units delivered for each treatment field. Translational deviations of isocenter position larger than 5 mm or 7 mm, for radical or palliative treatments, respectively, were immediately corrected. In order to estimate the extra workload involved with the on-line protocol, the time required for isocenter check and table correction was specifically monitored. Results Forty-eight patients were treated. In all, 482 fractions had electronic portal images taken. Two hundred and forty-five setup corrections were made (50.8% of all fractions). The occupation of the LINAC lasted 106 h on the whole. Twelve h and 25 min (11.7% of LINAC occupation time) were spent for portal image verification and setup correction. On the average, 4.3 fractions per hour were carried out. Conclusions When used by trained therapists, ideally, portal imaging may be carried out before each fraction, requiring approximately 10% of LINAC occupation time.