AGOR status report

This paper is available in a repository.
This paper is available in a repository.

Full text: Download

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Orange circle
Published version: archiving restricted
Data provided by SHERPA/RoMEO

Abstract

The past three years of AGOR operation have been a period of steady improvement of the cyclotron. The two problems causing most down time: failure of the helium refrigerator system and water leaks in the RF acceleration electrodes have been solved. The latter required redesign of the connection between the electrode and the coaxial line and a four month shutdown to implement the modifications. .