Links

Tools

Export citation

Search in Google Scholar

Status of vacuum system in J-PARC RCS

Journal article published in 2012 by J. Kamiya, N. Ogiwara, M. Nishikawa, Y. Hikichi, T. Yanagibashi, M. Kinsho
This paper was not found in any repository; the policy of its publisher is unknown or unclear.
This paper was not found in any repository; the policy of its publisher is unknown or unclear.

Full text: Unavailable

Question mark in circle
Preprint: policy unknown
Question mark in circle
Postprint: policy unknown
Question mark in circle
Published version: policy unknown

Abstract

Vacuum system of J-PARC Rapid Cycling Synchrotron (RCS) has been operating since 2007. There had been almost no trouble since then, so the actual system behaviour in case of unexpected trouble has not been examined. However, the J-PARC site was hit by the Great East Japan Earthquake in March 2011. Though accident analysis and recovery work, we investigated whether the system behaved correctly and how much damage the devices are sustained. We also summarize the results of the investigation about the dynamic pressure, which is caused by the high power beam and other elements.