Links

Tools

Export citation

Search in Google Scholar

Scrf Development at Triumf

This paper is available in a repository.
This paper is available in a repository.

Full text: Download

Question mark in circle
Preprint: policy unknown
Question mark in circle
Postprint: policy unknown
Question mark in circle
Published version: policy unknown

Abstract

TRIUMF started SCRF development with the superconducting heavy ion linear accelerator project, ISAC-II, in 2000. Since that time much work has been completed for development, prototyping and testing. The ISAC-II project was successfully completed and we now have in operation 40 superconducting bulk Nb QWR cavities assembled in eight cryomodules. The last twenty cavities, just completed, were produced by PAVAC Industries Inc. of Richmond BC; the first superconducting accelerator cavities produced in Canada. In 2007 TRIUMF started development towards a 50MeV electron superconducting linear accelerator to be used as a driver to produce radioactive ion beams through photofission. The accelerator is based on TTF/ILC elliptical bulk Nb cavities technology. Results, experience and plans of the SCRF program at TRIUMF will be discussed.