Fermi@elettra: Installation and commissioning of the sband rf system

This paper is available in a repository.
This paper is available in a repository.

Full text: Download

Question mark in circle
Preprint: policy unknown
Question mark in circle
Postprint: policy unknown
Question mark in circle
Published version: policy unknown

Abstract

FERMI@Elettra is a single-pass FEL user-facility covering the wavelength range from 100 nm (12 eV) to 4 nm (310 eV) and is located next to the third generation synchrotron radiation facility Elettra in Trieste, Italy. The first electron beam from the photocathode electron RF gun and injector system was extracted in August 2009. Commissioning and installation of the remaining linac and linac systems are continuing and will alternate through this year. The linac is based on S-band technology. It uses fifteen 3 GHZ 45 MW peak RF power plants powering the gun, the accelerating structures and the RF deflectors, and when completed will be able to deliver greater than 1.5 GeV electron beams to the FEL undulator system. This paper provides a summary of the installation activities and discusses the performances results of the main subassemblies both during the initial checkouts and through the commissioning of the accelerator.