Progressive Sustainable Developers Nepal, International Journal of Environment, 1(4), p. 1-15, 2015
Full text: Download
Urban solid waste management is a serious environmental issue confronting the cities in developing countries like Bangladesh. Apathy towards the problem, inadequacy of field level information and data, and resource constraints may be blamed for the dismal situation of solid waste management often visible in our cities. The most common problems associated with the absence of sustainable solid waste management practice include diseases transmission, odour nuisance, atmospheric and water pollution, visual blight, fire hazards and economic losses. In the three major cities of Bangladesh, Dhaka, Chittagong & Khulna, per capita production of solid waste is around 0.4kg /capita / day, but only a fraction of this waste is carried to the final disposal site. A recent study on Municipal Solid Waste Management found that waste generated in Chittagong was 0.352kg/cap/day. Considering per capita generation of solid waste as 0.352kg to 0.4kg per capita per day, for a population of 25, 92,459 distributed within the 41 wards of the city (BBS, 2011), total solid waste generated in Chittagong will be around 913 tons to 1037 tons per day in 2012. Currently, Chittagong City Corporation (CCC) has only two dumping yards: one at Ananda Bazar, Halishahar at the mid western part of the city and the other at Arefin Nagar, Pahartali at the northern tip of the city. None of these sites are sanitary landfill. Considering the city area of 168 sq. kms, only two dumping sites are not sufficient to cater to the requirement of the city. Long distances between the collection points and the disposal site are responsible for inefficient utilization of the CCC trucks and the resulting increase in the haulage time that eventually increases the costs of collection and disposal. This study utilized Geographic Information System (GIS) and Multi-Criteria Decision Method (MCDM) for the identification and selection of appropriate landfill sites within the city of Chittagong. Thirteen sites were identified initially. Out of these sites four were found to be most appropriate and suitable for use as landfill. DOI: http://dx.doi.org/10.3126/ije.v4i1.12174International Journal of Environment Volume-4, Issue-1, Dec-Feb 2014/15, page: 1-15