Dissemin is shutting down on January 1st, 2025

Published in

Elsevier, Journal of Cultural Heritage, 3(16), p. 255-266, 2015

DOI: 10.1016/j.culher.2014.06.008

Links

Tools

Export citation

Search in Google Scholar

Multisensor surveys of tall historical buildings in high seismic hazard areas before and during a seismic sequence

Journal article published in 2015 by Giordano Teza ORCID, Arianna Pesci, Sebastiano Trevisani
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Orange circle
Postprint: archiving restricted
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

A seismic sequence that included a moment magnitude M W =5.9 earthquake struck three regions of Northern Italy (Emilia Romagna, Veneto and Lombardy) in May-June 2012. The sequence caused significant damage to several historical buildings and in some cases caused complete structural collapse. Cracks appeared in the belfry and cusp of the 69m high, ~3° leaning bell tower of Ficarolo (Rovigo). A project aimed at studying the geometry of the tower, possible local seismic amplification and soil-structure interaction began in early 2013 before the earthquake. The data were provided by terrestrial laser scanning, low-cost operational modal analysis and geophysical measurements. The repetition of the surveys during and after the seismic sequence, which was augmented by thermal imaging measurements, allowed an evaluation of the changes caused by the earthquake. In addition to an evaluation of the damage, the data allowed the development of a method based on fast and relatively low-cost measurements that provide useful information for cultural heritage management purposes. The results highlighted that the surveys can be carried out during a seismic emergency and that preventive measures can be carried out under reasonable time and budget constraints in high seismic hazard areas.