Dissemin is shutting down on January 1st, 2025

Published in

Institute of Electrical and Electronics Engineers, IEEE Transactions on Fuzzy Systems, 3(32), p. 1278-1287, 2024

DOI: 10.1109/tfuzz.2023.3321720

Links

Tools

Export citation

Search in Google Scholar

Application of Critical Path Method in ePropertyWatch Plan Using Gaussian Pythagorean Fuzzy Numbers

Journal article published in 2024 by Muhammad Akram ORCID, Amna Habib ORCID, Muhammet Deveci ORCID
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO