Published in

Future Medicine, Regenerative Medicine, 10(17), p. 719-737, 2022

DOI: 10.2217/rme-2022-0064

Links

Tools

Export citation

Search in Google Scholar

Institutional and infrastructure challenges for hospitals producing advanced therapies in the UK: the concept of ‘point-of-care manufacturing readiness’

Journal article published in 2022 by Edison Bicudo ORCID, Irina Brass ORCID
This paper is made freely available by the publisher.
This paper is made freely available by the publisher.

Full text: Download

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Green circle
Published version: archiving allowed
Data provided by SHERPA/RoMEO

Abstract

Aim: To propose the concept of point-of-care manufacturing readiness for analyzing the capacity that a country, a health system or an institution has developed to manufacture therapies in clinical settings (point-of-care manufacture). The focus is on advanced therapies (cell, gene and tissue engineering therapies) in the UK. Materials & methods: Literature review, analysis of quantitative data, and qualitative interviews with professionals and practitioners developing and administering advanced therapies. Results: Three components of point-of-care manufacturing readiness are analyzed staff and institutional procedures, infrastructure, and relations between hospitals and service providers. Conclusion: The technical and regulatory experience that has been gained through manufacturing advanced therapies at small scale in hospitals qualifies the UK for more complex and larger-scale production of therapies in the future.