The High Luminosity LHC interaction region magnets towards series production

Journal article published in 2021 by Ezio Todesco ORCID, Hugo Bajas, Marta Bajko, Amalia Ballarino, S. Izquierdo Bermudez ORCID, Susana Izquierdo Bermudez, Bernardo Bordini, Luca Bottura, G. De Rijk, Gijs de Rijk, Arnaud Devred, Delio Duarte Ramos, Michal Duda, Paolo Ferracin, Paolo Fessia and other authors.
This paper is made freely available by the publisher.
This paper is made freely available by the publisher.

Full text: Download

Green circle
Preprint: archiving allowed
Orange circle
Postprint: archiving restricted
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

Abstract The High Luminosity Large Hadron Collider (HL-LHC) is the new flagship project of CERN. First endorsed in 2013 and approved in 2016, HL-LHC is an upgrade of the accelerator aiming to increase by a factor of ten the statistics of the LHC collisions at the horizon of 2035–2040. HL-LHC relies on cutting edge technologies: among them, large aperture superconducting magnets will replace the present hardware to allow a smaller beam size in two interaction points (IPs). The project involves the construction of about 150 magnets of six different types: the quadrupole triplet, two main dipoles and three orbit correctors. The triplet, manufactured at CERN and in the USA, will consist of 30 magnets based on Nb3Sn technology, with an operational peak field of 11.4 T. These will be the first quadrupole Nb3Sn magnets installed in a particle accelerator. The other five types of magnets, all relying on Nb–Ti technology, present non-trivial challenges in the design and construction; they will be manufactured as part of in-kind contribution under the responsibility of institutes in Japan, China, Spain, and Italy. The project is now in the phase of transition between qualification through short models and prototypes and the beginning of the series construction. In this paper we review the magnet requirements, the reasons for selecting the design, the technological challenges with respect to previous projects, and we summarize the steps that have been taken to validate the baseline.