Published in

Volume 11: Petroleum Technology, 2020

DOI: 10.1115/omae2020-18421

Links

Tools

Export citation

Search in Google Scholar

Study on Safety Operation Period Model of Deep Water Typhoon Avoidance Well Control Considering Rheological Characteristics of Drilling Fluid

Proceedings article published in 2020 by Wenqiang Lou, Zhiyuan Wang, Kai Du, Jianbo Zhang, Youqiang Liao, Shaowei Pan, Baojiang Sun
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

Abstract During the period of avoiding typhoon in deep-water drilling, the gas intrusion in the wellbore brings higher risk to the well opening operation. It is very important to improve the accuracy of typhoon avoidance cycle prediction to improve the efficiency of drilling operation and reduce the risk of well control. According to the yield stress characteristics of drilling fluid, the gas migration experiment in the yield stress fluid is carried out in this paper. Based on the experimental results and stress analysis, a prediction model of bubble rising velocity suitable for the yield drilling fluid is established. Considering the rheological properties of drilling fluid and pore characteristics of formation, a prediction model of initial bubble size is established. Combined with the velocity prediction model and bubble size prediction model, the calculation method of typhoon avoidance period is proposed. Through the calculation and analysis, it is found that under the condition of low invasion rate, the formation porosity has little influence on the initial size of bubbles, and the yield stress value of drilling fluid has great influence on the initial size of bubbles. At the same time, the model in this paper makes up for the problem that the prediction value of safe typhoon avoidance period calculated by the previous model is large, and reduces the risk of well opening operation. According to our calculation results, the measures of injecting drilling fluid with low yield stress at the bottom of the well and injecting drilling fluid with high yield stress at the top are put forward, which can effectively increase the safe typhoon avoidance period.