Published in

Elsevier, Swarm and Evolutionary Computation, (60), p. 100807, 2021

DOI: 10.1016/j.swevo.2020.100807

Links

Tools

Export citation

Search in Google Scholar

A genetic programming hyper-heuristic for the distributed assembly permutation flow-shop scheduling problem with sequence dependent setup times

Journal article published in 2021 by Hong-Bo Song, Jian Lin
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Orange circle
Postprint: archiving restricted
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO