Satellite Pre-Failure Detection and In Situ Monitoring of the Landslide of the Tunnel du Chambon, French Alps

Journal article published in 2019 by Mathilde Desrues, Pascal Lacroix ORCID, Ombeline Brenguier
This paper is made freely available by the publisher.
This paper is made freely available by the publisher.

Full text: Download

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Green circle
Published version: archiving allowed
Data provided by SHERPA/RoMEO

Abstract

Recent studies using satellite data have shown a growing interest in detecting and anticipating landslide failures. However, their value for an actual landslide prediction has shown variable results. Therefore, the use of satellite images for that purpose still requires additional attention. Here, we study the landslide of the Tunnel du Chambon in the French Alps that ruptured in July 2015, generating major impacts on economic activity and infrastructures. To evaluate the contribution of very high-resolution optical satellite images to characterize and potentially anticipate the landslide failure, we conduct here a retro analysis of its evolution. Two time periods are analyzed: September 2012 to September 2014, and May to July 2015. We combine Pléiades optical images analysis and geodetic measurements from in situ topographic monitoring. Satellite images were correlated to detect pre-failure motions, showing 1.4-m of displacement between September 2012 and September 2014. In situ geodetic measures were used to analyze motions during the main activity of the landslide in June and July 2015. Topographic measurements highlight different areas of deformations and two periods of strong activity, related to the last stage of the tertiary creep and to anthropic massive purges of unstable masses. The law of acceleration toward the rupture observed in June and July 2015 over the topographic targets also fits well the satellite observation between 2012 and 2014, showing that the landslide probably already entered into tertiary creep 2.5 years before its failure.