Published in

SAGE Publications, Journal of Telemedicine and Telecare, 10(23), p. 850-855, 2017

DOI: 10.1177/1357633x17734004

Links

Tools

Export citation

Search in Google Scholar

Transitioning from a single-site pilot project to a state-wide regional telehealth service: The experience from the Victorian Stroke Telemedicine programme

This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Green circle
Postprint: archiving allowed
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

Scaling of projects from inception to establishment within the healthcare system is rarely formally reported. The Victorian Stroke Telemedicine (VST) programme provided a very useful opportunity to describe how rural hospitals in Victoria were able to access a network of Melbourne-based neurologists via telemedicine. The VST programme was initially piloted at one site in 2010 and has gradually expanded as a state-wide regional service operating with 16 hospitals in 2017. The aim of this paper is to summarise the factors that facilitated the state-wide transition of the VST programme. A naturalistic case-study was used and data were obtained from programme documents, e.g. minutes of governance committees, including the steering committee, the management committee and six working groups; operational and evaluation documentation, interviews and research field-notes taken by project staff. Thematic analysis was undertaken, with results presented in narrative form to provide a summary of the lived experience of developing and scaling the VST programme. The main success factors were attaining funding from various sources, identifying a clinical need and evidence-based solution, engaging stakeholders and facilitating co-design, including embedding the programme within policy, iterative evaluation including performing financial sustainability modelling, and conducting dissemination activities of the interim results, including promotion of early successes.