Published in

Springer, Environmental Science and Pollution Research, 1(22), p. 305-313, 2014

DOI: 10.1007/s11356-014-3350-5

Links

Tools

Export citation

Search in Google Scholar

Assessment of long-term phosphorus retention in an integrated constructed wetland treating domestic wastewater

Journal article published in 2014 by Mawuli Dzakpasu ORCID, Miklas Scholz, Valerie McCarthy, Siobhán N. Jordan
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Orange circle
Postprint: archiving restricted
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO

Abstract

Due to the nature of the phosphorus (P) removal mechanisms associated with constructed wetlands, the sustainability of P treatment is usually of high interest. As a result, a 4-year dataset from a typical multi-celled integrated constructed wetland (ICW) located at Glaslough in Co. Monaghan, Ireland was evaluated to determine the effects of long-term P loadings and hydrological inputs on P treatment. The ICW was intensively monitored year-round from February 2008 through March 2012 for total P and molybdate reactive phosphate (MRP). Domestic wastewater was loaded at 16.4 ± 0.96 g m(2) year(-1) for total P and 11.2 ± 0.74 g m(2) year(-1) for MRP. Average mass reductions over the monitoring period were 91.4 and 90.1%, respectively. The area-based kinetic coefficients (K(20)) of 11.8 for total P and 15.6 m year(-1) for MRP indicated a high area-specific retention rate. The ICW appeared to have a sustained capacity for P adsorption and retention, but the treatment was influenced mainly by external hydrological inputs and fluctuations in wastewater loadings. Linear regression analyses showed a reduction in mass retention of both total P and MRP with increased effluent flow volumes. Monthly mass reductions exceeded 90% when the effluent flow volumes were less than 200 m(3) day(-1). When monthly effluent flow volumes exceeded 200 m(3) day(-1), nonetheless, mass reductions became highly variable. Designs and management of ICW systems should adopt measures to limit external hydrological loadings in order to maintain sufficient P treatment.