Published in

Elsevier, International Journal of Electrical Power & Energy Systems, (117), p. 105612

DOI: 10.1016/j.ijepes.2019.105612

Links

Tools

Export citation

Search in Google Scholar

Post-disaster power system restoration planning considering sequence dependent repairing period

Journal article published in 2020 by Jiahao Yan, Bo Hu, Kaigui Xie, Heng-Ming Tai, Wenyuan Li
This paper was not found in any repository, but could be made available legally by the author.
This paper was not found in any repository, but could be made available legally by the author.

Full text: Unavailable

Green circle
Preprint: archiving allowed
Red circle
Postprint: archiving forbidden
Red circle
Published version: archiving forbidden
Data provided by SHERPA/RoMEO