Published in

IOP Publishing, IOP Conference Series: Materials Science and Engineering, 1(794), p. 012042, 2020

DOI: 10.1088/1757-899x/794/1/012042

Links

Tools

Export citation

Search in Google Scholar

Research on key technologies for construction of super-deep railways stations near existing lines in the flood land area of the Yangtze River

Journal article published in 2020 by Yang Qiongpeng, Ma Bin, Li Wei, Sun Bin
This paper is made freely available by the publisher.
This paper is made freely available by the publisher.

Full text: Download

Red circle
Preprint: archiving forbidden
Red circle
Postprint: archiving forbidden
Green circle
Published version: archiving allowed
Data provided by SHERPA/RoMEO

Abstract

Abstract In this paper, taking Nanjing Mochou Lake Metro Station as an example, the key technologies for the construction of super-deep stations near existing lines in the flood land area of the Yangtze River are studied. Mochou Lake Station is located in Mochou Lake Park on the Qinhuai River. It is a four-level underground island-type platform station, which is interchanged with the existing Line 2 Mochou Lake Station. The station used the “two-light and two-dark” construction method. The first and the second underground floor of the station used an open excavation order method, and the third and the fourth underground floor used to cover and cut-bottom up method. According to the monitoring results and settlement analysis results of the main structure, the construction method of “two-, light and two-dark, ” can help control the deformation of the construction area and ensure the safety of the surrounding structures and existing stations.